Following stages are generally followed in any implementation project.
1. Identifying the data to be migrated.
2. Determining the timing of the data migration.
3. Finalizing data templates.
4. Finalizing the method of data migration.
5. Freezing the design of program.
6. Deciding on migration related setups.
7. Post migration validation