How to Plan OSP Item/Resources with ASCP

For example consider a business flow like the following.

1. There is a finished good item say fg_item_A
2. This item has the sales forecast.
3. The routing for this item has an OSP at the resource sequence 10.
4. Suppose this OSP has been defined as an OSP item say osp_item_A
5. We would like to treat the OSP item (osp_item_A) as one of the component for the finished good item (fg_item_A).
6. We would like to collect the supply/demand info for the OSP item (osp_item_A), based on the forecast & sales order that has been entered for the finished good item (fg_item_A).
7.Normally, a purchase order will be generated after a job for this item (fg_item_A) is released.

Oracle Apps Outside Processing (OSP) Module Material Download

Oracle Apps Outside Processing (OSP) Module is explained in detailed with screen shots. Following setups are included in the download:
    • OP Autocreate PO Training
    • OP Close an Outside Processing Discrete Job Training
    • OP Complete a Discrete Job Training
    • OP Create an Outside Processing Discrete Job Training